We started working in our assigned area (C32) on 11/14/2008. Our objective was to setup over 100 small floating pontoons to be used to light the water channels between each of the "fronds" on the east side of the palm. The fronds are where the houses are constructed so each house has a small beach off their backyard.
The pontoons each held 8 cakes (the first five being smaller diameter cakes as the waterway is narrower closer to the trunk). The cakes were set on the platform in order, secured using bailing wire and then their igniters wired into a firing panel. Finally, they were covered with plastic and towed to their location where each was secured with multiple anchors. It took 3 days prepare and place each pontoon another 3 days interconnect them all and make connections to the shore.